public

Ferrovial-Cespa Project

Publicada en

Ferrovial-Cespa PROJECT   Company   Location Santa María de Palautordera (Barcelona – Spain) Implementation time 3 months Need Monitoring of operating parameters (vibrations and temperature) in the landfill gas recovery and the leachate treatment plants from the Sta. Mª de Palautordera landfill. Solution The solution consists in the installation of two INDU-EYE LoRA Vibro (in a landfill gas blower and in the cogeneration ventilator  motor) and a INDU-EYE LoRA Termo to monitor the temperature at the outlet of the leachate evaporation plant The installation consists of 4 components: 1) The thermogenerator. It is the device capable of generating electrical energy from […]

public

Tubacex POC Project

Publicada en

TUBACEX POC PROJECT   Company   Location Amurrio (Araba – Spain) Implementation time 3 months Need Monitoring of a furnace blower motor. The implementation must continuously monitor the motor vibrations in order to predict the deterioration of the installation and anticipate the appearance of technical problems. Solution INDU-EYE LoRa Vibro The iIoT INDU-EYE LoRA Vibro platform consists of 4 components: 1) The thermogenerator. It is the device capable of generating electrical energy from waste heat and that will power the entire system. In this case, the furnace has a flat surface with a temperature of 98.3 degrees Celsius. 2) The accelerometer sensor. […]